Smithsonian Institution Arts + Industries Building, Washington D.C.
Case Study
The Problem
A previous analysis determined the AIB did not comply with applicable fire and life safety code or egress requirements, and until compliance was met, the building could not be occupied. However, compliance was not possible without permanently compromising the building’s historic features.
The Solution
We conducted a performance-based fire analysis in accordance with NFPA code. Using fire and smoke modeling, we found the ground floor could be safely occupied without building modifications and the mezzanine could be safely occupied with additional fire protection features, such as smoke control.
The Results
Our analysis safeguarded the historic fabric of this 130+ year old building while providing the Smithsonian with the information they needed to transition the AIB back into a functioning branch of the Smithsonian Institution.
Global presence, local reach
We have more than 90 offices worldwide.
What sets us apart
Find out what makes us different.
Our Services
How we help solve your challenges.