The Problem
The client needed to investigate multiple miles of pipe to identify what factors contributed to the failures. They also needed help coordinating the many investigative parties and the contractors responsible for the decommission and rebuild occurring concurrently.
The Solution
We performed on-site assessment activities including pipe identification and tracking, system flow and pressure measurements, evidence movement and preservation and mechanical systems evaluation. We also conducted extensive laboratory examinations to pinpoint the root cause of failure.
The Results
Our examination, along with an exhaustive evaluation of other factors of the pipe system, confirmed that degradation of the pipe was likely caused by copper catalysed thermo-oxidation. These factors contributed to the failure of the pipe. The building was refitted, in conjunction with our investigation, with a new potable water system. The concurrent work required a coordinated effort which ultimately allowed tenants to safely return to their units.
Insights