MarkWest Energy Partners, US
Case Study
The Problem
Multiple MarkWest facilities required hazard assessments for their fractionators, storage tanks, truck and rail racks, fire protection water storage and underground water systems. They needed design and construction of all projects to be completed on an expedited schedule.
The Solution
We provided a full scope of risk engineering services including the design of fire detection, alarm and above and below-ground water systems. Following the design, we provided full time on-site construction supervision services to ensure the projects were delivered on-schedule and under budget.
The Results
We met the demands of an expedited schedule, and our involvement provided MarkWest with the required confidence that their facilities are in full compliance with local, state and federal regulation. This allowed the requirements to be met in the most efficient and cost-effective manner possible.
Global presence, local reach
We have more than 90 offices worldwide.
Submit a Request for Proposal
How can we help your business?
Our Services
How we help solve your challenges.