Denver International Airport South Terminal Redevelopment
Case Study
The Problem
The combination of the high-rise hotel, high-occupancy assembly and storage merged with hazards ranging from rail cars to quantities of piled plastic materials and vehicular traffic created a challenging environment that is outside the scope of typical codes and standards.
The Solution
We conducted fire and evacuation modeling to develop a performance-based strategy which incorporated smoke management, egress design and a mass notification system integrated with the existing fire alarm system.
The Results
We designed the required systems and then performed system integration and commissioning to ensure that the new systems worked properly with the existing airport systems. This provided proper fire detection and alarm and initiation of active fire protection systems to ensure passenger safety.
Our Services
How we help solve your challenges.
Global presence, local reach
We have more than 90 offices worldwide.
Our Industries
We have experience in your industry.